Steve and Rob sweated it out over the weekend - in 35 degree plus heat - to complete two main projects.
Project 1
Our bore was in need of revovations. Everytime we turned it on no water would come out.
Step 1 - dig out the orginal bore house that had filled with dirt because of previous poor construction of the house.
Step 2 - Construct a new improved bore house, flush the sprinklers and add a large filter near the bore (to filter before it reaches the sprinkler heads and blocks them).
Step 3 - Construct a new roof (including a 'mini' roof for the new filter - right of picture) and ship out surrounding dirt so it doesn't fall back into the new bore house.
Project 2
Construct a large skylight to allow for more light in the kitchen and eating area.
Finished skylight.
My main project was to get the mini pool into shape.....
Project 1
Our bore was in need of revovations. Everytime we turned it on no water would come out.
Step 1 - dig out the orginal bore house that had filled with dirt because of previous poor construction of the house.
Step 2 - Construct a new improved bore house, flush the sprinklers and add a large filter near the bore (to filter before it reaches the sprinkler heads and blocks them).
Step 3 - Construct a new roof (including a 'mini' roof for the new filter - right of picture) and ship out surrounding dirt so it doesn't fall back into the new bore house.
Project 2
Construct a large skylight to allow for more light in the kitchen and eating area.
Finished skylight.
My main project was to get the mini pool into shape.....